WINTERIZATION PACKAGES 2016-2017
ALL ENGINE WORK IS PERFOMED BY TECHNICIANS USING THE BEST MATERIALS
SHRINK WRAPPING SERVICES
- 7 Mll heavy duty wrap material
- supporting framing
- mildew control bags
- airlett - air conditioning vents
$14.00 per foot up to 20ft
$15.00 per foot over 20ft and pontoons
**BEST VALUE - COMPLETE STORAGE PACKAGE**
STORE THROUGH APRIL 15TH 2015 IN A SECURE FENCED LOT
WINTERIZE AND DECOMMISSION ENGINE
SHRINK WRAP SERVICE
COMPLETE PACKAGE - $43.50 PER FT
PICKUP AND DELIVERY OF A BOAT FROM ANY LOCATION IS A MINIMUM OF $150
OTHER AVAILABLE SERVICES
- CHANGE ENGINE OIL AND FILTER $125
- ACID WASH BULL BOTTOM $9.00 PER FOOT
- FISHING BOAT LIVE WELL PURE AND WINTERIZE $29.95
- WATER SYSTEMS, HOT WATER HEATERS& WASH DOWN SYSTEMS
ENGINE WINTERIZING AND DECOMMISIONING
OUTBOARDS
- ADD FUEL STABILIZER TO FUEL SYSTEM
- DRAIN LOWER UNIT LUBERICANT (GEAR LUBE) PRESSURE TEST AND REFILL
- START ENGINE AND ADMINISTER FOGGING SOLUTION
- SPRAY POWERHEAD WITH CORROSION INHIBITOR
- LUBRICATE COMBUSTION CHAMBERS
- PUREGE FUEL SYSTEM AND RUN ENGINE ON NON-ETHANOL FUEL
LABOR & MATERIALS:
50HP AND LOWER $125
ABOVE 50 HP $175
STERNDRIVES & I/O
- ADD FUEL STABILIZER TO FUEL SYSTEM
- DRAIN LOWER UNIT ASSEMBLY AND REFILL
- START ENGINE AND FLUSH COOLING SYSTEM WITH FRESHWATER AND
ADMINISTER FOGGING SOLUTION
- REMOVE STERN DRIVE ASSEMBLY AND INSPECT BELLOWS, GIMBLE
BEARING, U-JOINTS,UPPER DRIVE YOKE, GREASE OUTPUT SHAFT AND
RE-INSTALL DRIVE UNIT
- DRAIN ENGINE COOLING SYSTEM AND FILL WITH NON TOXIC ANTIFREEZE
- SPRAY ENGINE WITH CORROSION INHIBITOR
- GREASE STERN DRIVE FITTINGS
LABOR & MATERIALS $340.00
(PER ENGINE)
NOTE: I/O's MUST BE SUMMERIZED IN SPRING PRIOR USE - @ $240.00
SPRING START UP (NOT INCLUDED IN WINTER STORAGE PACKAGE)
- REMOVAL AND DISCARD SHRINK-WRAP
- LOAD TEST BATTERY SUMMERIZE ENGINE INCLUDING, START UP, AND
CHECK OPERATION
- TEST ALL EQUIPMENT (LIGHTS, PUMPS ECT.)
BILLED AT $240.00
***PLEASE NOTE - ALL BILGE DRAIN PLUGS ARE LEFT OUT!!! IT IS THE BOAT OWNER'S
RESPONSIBILITY TO CHECK AND RE-INSTALL PRIOR TO LAUNCHING
*** PLEASE NOTE - SUMMERIZATION AND SPRING PREP MUST BE DONE TO ALL ENGINES PRIOR TO LAUNCH AND USE IN THE SPRING